This full house renovation project Barry homeowners can see here began with an older kitchen, bathroom and dividing wall that kept the kitchen separate from the living area. Before moving in, the owners wanted to open up the layout, replace key fittings and prepare several rooms for new finishes.
Cooksey Renovation coordinated the strip-out, internal alteration, kitchen renewal, bathroom fitting, plastering and other agreed work. Project photographs show the opened rooms and finished kitchen.
The Challenge

Joining the Rooms Before Moving In
The owners wanted the kitchen to connect with the living space rather than remain behind a dividing wall.The kitchen and bathroom also needed updating, with plastering required in several rooms.
Renovating before moving in allowed these connected stages to be planned as one project, instead of treating the opening, kitchen and other rooms as unrelated jobs.The aim was to create a more connected layout while coordinating the different stages of refurbishment across the property.
Planning the Full House Renovation Project Barry

Removing the Dividing Wall
The initial work included stripping out the old kitchen and removing fittings before the new layout took shape.An opening was formed in the wall between the kitchen and living space.Progress photographs show temporary props supporting the masonry while the opening was being made. They do not establish the final support design or any beam dimensions.
The Welsh Government’s guidance on internal walls explains that removing a wall or creating an opening will normally involve building regulations.No project approval documents were supplied, so this case study does not claim a particular approval or structural specification.The work is relevant to both open-plan renovations and structural alterations, where the proposed opening and required support must be assessed for the property.
The Work Carried Out

Fitting a New Kitchen Facing the Living Area
The new kitchen has grey gloss cabinets, a wood-effect worktop and a peninsula facing the opened living space.Two glass pendant lights hang above the peninsula, with patio doors visible beyond the adjoining room.A sink beneath the window, induction hob and built-in oven complete the visible kitchen fittings.
Wood-effect flooring extends through both areas, helping the connected layout feel consistent.The peninsula provides useful worktop space while maintaining a connection between the kitchen and living area.This kitchen installation formed one part of the wider renovation rather than a standalone kitchen replacement.
You can read more about this type of work through Cooksey Renovation’s kitchen fitting service.
Updating the Bathroom and Boiler
The bathroom received a replacement suite as part of the project.However, the supplied house photographs do not provide a separate finished bathroom gallery, so specific fittings and finishes are not described.
A new boiler was also installed. A progress photograph shows the unit with pipework still exposed, rather than a completed enclosure.For homeowners planning similar changes, the Welsh Government’s kitchen and bathroom regulations guidance explains when associated drainage or electrical work may require approval.
Plastering and Making Good
Several rooms were plastered and made good following the strip-out and changes to the layout.This prepared the affected surfaces for later decoration.The work formed part of the coordinated house refurbishment rather than being treated as an unrelated plastering job.
Materials and Finishing Details

A Kitchen That Connects with the Living Space
The finished photographs show the kitchen peninsula looking through the wide opening to the living area and garden-facing doors.The grey units and continuous wood-effect floor help the two rooms sit together.
The new layout also creates a clearer visual connection between cooking and living areas without the previous dividing wall.The project records identify a replacement boiler and bathroom fitting, but they do not establish a full-house rewire, the dimensions of any structural beam or a complete list of fittings for every room.
The Result

Connected Rooms and a Refreshed Kitchen
The full house renovation project Barry homeowners can see in the before-and-after photographs changed a divided kitchen and living arrangement into connected spaces.
The documented renovation also included a new kitchen, replacement bathroom suite, boiler installation and plastering in several rooms.The photographs support the room opening and kitchen result, while the supplied project information records the other work.
The most noticeable change is the connection between the kitchen and living space.Rather than being separated by the original wall, the rooms now share a wide opening, with the new peninsula positioned towards the living area.The result demonstrates how layout changes and room improvements can be coordinated within a larger renovation before the homeowners move in.
Full House Renovation Project Barry Photographs

The project images show the original kitchen, temporary support during the wall opening and the finished peninsula looking through to the patio doors.Other photographs document plastering and the boiler installation stage.
Together, these images provide a record of the work from the original layout through to the updated kitchen and connected living space.
See more projects and case studies from Cooksey Renovation.
Planning a Full House Renovation Before Moving In?
If your property needs layout changes as well as a new kitchen, bathroom or wall finishes, planning the work together can help identify which trades and stages are involved.A full renovation can include several connected areas of the property, with each stage affecting the preparation required for the next.
Cooksey Renovation undertakes full house renovations across the Vale of Glamorgan.Lance Cooksey remains the main point of contact, with a site visit followed by a written quotation covering the agreed scope and expected timescales.
To discuss your property, contact Cooksey Renovation and arrange a site visit.